Simadan

 
  • Location
    Amsterdam
  • Construction time
    32 months
  • Automation system
    Siemens PCS7 with route control

Simadan

At the site of Simadan, a supplier of renewable energy generated from waste products from the food industry and fats, a fully automated tank farm was built to facilitate the production of 200 million liters biodiesel per year.

Our activities included the high-voltage system for the entire site (cooperation with Joulz, 6 pcs transformer substation feeding and loop), all control and low voltage panels, steering system using I / O units (30 units), project management, consulting, system architecture, functional and technical design, realization, testing and commissioning with regards to automation, instrumentation and lighting.